Our main activities for GRP Manufacturers

Our main activities for GRP Manufacturers are the following:

  • We carry out structural calculations, or check them, (please download a DEMO of the programme that you can find on the left of this page), and supply the relevant construction drawings and technical reports; we offer consulting engineering for the designing of new structures, or the reviewing of Technical, Buying or Manufacturing Specifications,- for the research and technological development or for the evaluation of used production machines;
  • We design underground double wall tanks: design, leakage continuous monitoring system, consulting service for conforming to existing regulations (Ministerial Decree no. 246 dated 24 May 1999); leakage tests, periodical checks (once a year), compilation of the Maintenance Logbook;
  • We carry out Laboratory tests for the evaluation of chemical and physical characteristics of raw materials or finished products, acoustic emission monitoring, as well as the circumferential deformation check on GRP tank or pipe wall (max. allowed value: 0.1%);
  • We advise, experiment and carry out laboratory tests on mixes of resins specifically studied to meet all particular requirements concerning chemical-physical properties of laminates in operation;
  • We carry out working environment tests (internal and external), risk mapping, or we can offer our consulting service on Safety at Work;
  • We analyze and optimize, according to our Customer’s requirements, the production flow and/or the existing lines;- We offer our service for the designing and starting up of new production facilities, from feasibility studies and required productivity analyses, throughout the layout of the plant, the starting up and optimization of the production;
  • We help our Customer while selecting materials, engineering, designing and supplying of GRP production or assembling machines, as well as while developing new production technologies;
  • We may supply all the required drawings and advise the best setting for the new plants lay-out.